Cooling Tower Replacement Modernizes Chemical Production Facility in the Czech Republic

A Marley Case Study

Marley NC® Cooling Towers installed during the phased replacement of aging concrete cooling towers at a chemical production facility in Ústí nad Labem, Czech Republic.

A major chemical manufacturing facility located in Ústí nad Labem, Czech Republic, required the modernization of aging cooling infrastructure to support continued plant operations and improve overall cooling performance. The project involved replacing three existing concrete cooling towers that had deteriorated significantly over time and were no longer aligned with the facility’s operational and efficiency goals.

To support the replacement project, the customer partnered with local Marley representatives, Perax Spol, to develop a phased cooling tower solution capable of minimizing operational disruption while improving cooling capacity, energy efficiency and sound performance.

The key project objectives included:
• Replace aging concrete cooling towers without long-term production shutdowns
• Increase cooling capacity and operational reliability
• Reduce energy consumption
• Lower operational sound levels
• Execute installation within limited available space and tight project timelines

Cooling Tower Case Study - Challenges

Project Challenges

One of the primary project requirements was completing the cooling tower replacement gradually in multiple phases while maintaining ongoing plant production. Space limitations and restricted installation timelines added further complexity to the project.

To support continuous facility operation, the first phase of cooling towers required temporary installation and connection before being relocated to the existing concrete basin as additional project phases progressed.

Additional project considerations included:
• Limited available installation space onsite
• Maintaining plant operations during replacement activities
• Coordinating phased installation over multiple years
• Relocating tower sections into final position on the existing basin structure
• Reducing structural loading on the aging concrete basin system

Cooling Tower Case Study - Solutions
Marley Solution

To meet the project requirements, the facility selected Marley NC® Kühltürme with FRP fibreglass construction. The project was completed in multiple phases, with two cells installed in 2020 followed by three additional cells in 2022.

The supplied cooling towers included the following specifications:

• Tower Models: NC8414VCN2FQK / NC8414VCN1FQK / NC8414VCN2FQK
• Material of Construction: Z725 Galvanised Steel / FRP Fibreglass
• Fill Pack: 15 Mil PVC Fill
• Fan Type: Ultra Quiet Fan
• Mechanical Configuration: Motor Inside Airstream (MIA) with Marley Geareducer®  gear drive

The cooling towers were supplied in knocked down format to allow onsite assembly within the limited project footprint. Tower sections were assembled in a designated laydown area before being lifted by crane and positioned onto the existing concrete basin structure.

To further support the existing basin conditions and reduce loading on the steel support beams, waste outlets were added at the bottom of each tower to help reduce water levels within the collection basin.

Marley Solution

To meet the project requirements, the facility selected Marley NC® Kühltürme with FRP fibreglass construction. The project was completed in multiple phases, with two cells installed in 2020 followed by three additional cells in 2022.

The supplied cooling towers included the following specifications:

• Tower Models: NC8414VCN2FQK / NC8414VCN1FQK / NC8414VCN2FQK
• Material of Construction: Z725 Galvanised Steel / FRP Fibreglass
• Fill Pack: 15 Mil PVC Fill
• Fan Type: Ultra Quiet Fan
• Mechanical Configuration: Motor Inside Airstream (MIA) with Marley Geareducer®  gear drive

The cooling towers were supplied in knocked down format to allow onsite assembly within the limited project footprint. Tower sections were assembled in a designated laydown area before being lifted by crane and positioned onto the existing concrete basin structure.

To further support the existing basin conditions and reduce loading on the steel support beams, waste outlets were added at the bottom of each tower to help reduce water levels within the collection basin.

Cooling Tower Case Study - Solutions
Cooling Tower Case Study - Results
The Results

The Marley NC Cooling Towers successfully modernized the facility’s cooling infrastructure while supporting phased project execution and continuous plant operation throughout the replacement process. Additional project benefits included:

• Increased Cooling Capacity: The upgraded Marley cooling towers improved overall cooling performance compared to the aging concrete tower system.

• Reduced Energy Consumption: The new cooling solution provided improved operating efficiency, helping reduce overall energy usage for the facility.

• Lower Sound Levels: The inclusion of Marley Ultra Quiet Fans helped reduce operational noise levels for the plant environment.

• Flexible Phased Installation: The staged installation approach allowed the customer to continue production operations without requiring extended shutdown periods.

• Long-Term Reliability: The combination of galvanized steel and FRP fibreglass construction provided a modernized cooling solution designed for long-term durability and operational performance.

The collaboration between the client and Perax Spol helped ensure the successful replacement of aging cooling infrastructure while minimizing operational disruption and improving cooling efficiency for the chemical production facility.

Variable frequency drives (VFDs) supporting Marley NC® Cooling Tower fan operation, helping optimize energy efficiency and cooling performance across the facility.
Products and Services Provided

Duty Parameters

  Phase 1 Phase 2 Phase 3
Flowrate (m3/h) 1,132 m3/h 795 m3/h 1,130 m3/h
Hot Water Inlet Temperature (°C) 36 34 36
Range (°C) 10 7 10
Cold Water Outlet Temperature (°C) 26 27 26
Approach (°C) 5 6 5
Wet Bulb Temperature (°C) 21 21 21
Heat Load (kW/h) 13,070 kW 6,426.5 kW 13,070 kW
Project Team

Marley Representatives: Perax Spol

Mechanical Contractor(s): Perax Spol

de_DEGerman