Zone franche de Dubaï

A Marley Case Study
The project layout had to accommodate 12 cooling tower cells total, requiring precise planning.

Créée en avril 2021, cette installation a été la première zone franche de Dubaï dédiée au commerce numérique. au Moyen-Orient, en Afrique du Nord et en Asie du Sud.

The 207,000 square-meter hub offers comprehensive logistics solutions and flexible office spaces while its free trade platform includes tax and investment incentives for businesses.

When it came time to determine how the facility would provide comfort cooling to the entire complex, the main concerns included:

  • Energy efficiency
  • Ease of maintenance
  • Partial load operation (Variable flow)
Cooling Tower Case Study - Challenges
Project Challenges
  • Limited Space: The project layout had to accommodate 12 cooling tower cells total, requiring precise planning.
  • Motor Placement Preference: The client requested that motors be positioned outside the cooling towers to optimize space, maintenance and longevity.
  • Change in Delivery Mode: The original plan included factory-assembled towers, but due to project constraints, the scope was eventually changed to knockdown (KD) delivery.
Cooling Tower Case Study - Solutions
Marley Solution

After consulting with the customer and project contractor, SPX Cooling EMEA determined the best solution would be three (3) Marley NC Cooling Towers (Model NC8414) with the following specifications:

  • Full stainless-steel construction for durability and corrosion resistance
  • FM Factory Approval
  • Low sound fans
  • Single bottom inlet
  • Variable frequency drive (VFD) panels
  • Water level controls and oil level switches
  • Total heat capacity of 25,915kW
Marley Solution

After consulting with the customer and project contractor, SPX Cooling EMEA determined the best solution would be three (3) Marley NC Cooling Towers (Model NC8414) with the following specifications:

  • Full stainless-steel construction for durability and corrosion resistance
  • FM Factory Approval
  • Low sound fans
  • Single bottom inlet
  • Variable frequency drive (VFD) panels
  • Water level controls and oil level switches
  • Total heat capacity of 25,915kW
Cooling Tower Case Study - Solutions
Cooling Tower Case Study - Results
The Results

The cooling towers were delivered on schedule and installation was supervised by the SPX Cooling team, working closely with the onsite contractor. The cooling towers were engineered to include outside airstream motors, as requested, with industry-leading Marley Geareducer® gearboxes. Despite delays in the full scope of the mechanical system, installation of the cooling towers was completed successfully, and the towers are operating smoothly.

  • The cooling towers met the facility’s efficiency goals, ensuring optimal chiller operation.
  • Addition of Marley Drift Eliminators, MarleyGard Low-Flow Nozzle Cups et Sweeper Piping System help minimize water consumption and power requirements throughout the year.
  • The client is preparing for Phase 2 and has already reached out to SPX Cooling EMEA for technical assistance.
Products and Services Provided

The successful installation of Marley cooling towers at this free zone facility in Dubai highlights SPX Cooling EMEA’s capability to deliver reliable, energy-efficient, space-optimized cooling solutions. Today, this free zone facility offers a variety of businesses a modern building space and landscapes to encourage clients to adopt a healthy and active approach to business.

Duty Parameters
Flowrate (m3/h): 4,089m3/h
Hot Water Inlet Temperature (°C): 39.4
Range (°C): 5.5
Cold Water Outlet Temperature (°C): 33.9
Approach (°C): 2.9
Wet Bulb Temperature (°C): 31
Heat load (kw/h): 25,915kW

Project Team

Une véritable assistance de la part d'une véritable équipe

EMEA Cooling Tower Customer

Nos clients parlent - Écoutez ce qu'ils ont à dire :

"Marley was the brand I learned all about cooling towers from. To this day, we still use Cooling Tower Fundamentals as our reference guide for new engineers joining.”

“With SPX Marley products, we can always trust that the cooling performance will match the data it was designed to meet and what was promised!"
"We have maintained a Marley cooling tower since it was installed in 1984. It has been a great equipment!