A major pharmaceutical organization with operations in Grangecastle, Ireland, was in dire need of a cooling tower replacement in late 2023, so the project team reached out to their local Marley representatives.

The facility was looking to replace two cooling towers from another manufacturer, which had been out of use for an extended period because of corrosion-related issues. Six other units from the other manufacturer were to remain in operation alongside the new installation.

The key objectives for this upgrade included:

  • Improve energy efficiency
  • Ensure ease of installation
  • Limit sound levels
  • Provide operational flexibility
Cooling Tower Case Study - Challenges
Project Challenges

Like most cooling tower projects, a thorough discussion of all the project details was key to determining the requirements for the facility and to meet the needs of the engineers. Local Marley representatives, Cooling Towers & Accessories (CT&A), and SPX Cooling EMEA met with the team and offered solutions that would satisfy the project scope, including:

  • Flexibility to accommodate the operator’s N+1 phased production scale-up
  • Designs capable of matching existing footprint and capacity
  • Limit noise due to nearby business operations and existing sound concerns

Read more about the Research and Development Center.

Cooling Tower Case Study - Solutions
Marley Solution

The project team determined that Marley® NC Cooling Towers (Model 8411UCN) would be the right solution, with the following specifications:

  • Material of Construction: Stainless Steel S304
  • Fill Pack: 15 Mil PVC MX75
  • Fan Type: Ultra Quiet Fan
  • Mechanicals: Motor Inside Airstream with Marley Geareducer® gearbox
  • Controls: Basin level and heater controls and vibration control panels
Marley Solution

The project team determined that Marley® NC Cooling Towers (Model 8411UCN) would be the right solution, with the following specifications:

  • Material of Construction: Stainless Steel S304
  • Fill Pack: 15 Mil PVC MX75
  • Fan Type: Ultra Quiet Fan
  • Mechanicals: Motor Inside Airstream with Marley Geareducer® gearbox
  • Controls: Basin level and heater controls and vibration control panels
Cooling Tower Case Study - Solutions
Cooling Tower Case Study - Results
The Results

The cooling towers were delivered to the site and positioned near the existing platform until installation the following week. Within two weeks after install, the cooling towers were started up and effectively met the operator’s cooling load requirements, with additional benefits along the way, including:

  • Energy Efficiency: The facility’s N+1 solution provides a lower-energy cooling option, which also minimizes noise impact, especially with the addition of the Marley Ultra Quiet Fan in the new towers.
  • Operational Flexibility: The variable flow capability of the Marley NC supports a gradual increase in cooling demand while mitigating risks of icing and bacteria through continuous wetted surfaces and water circulation.
  • Enhanced Monitoring & Maintenance: Basin level, heater and vibration monitoring provides advanced operational insights, limiting downtime and keeping the operators informed of potential concerns.

The collaboration of the operator, engineering house and CT&A was essential to this project. All parties understood the importance of finding the right solution designed for flexibility and long-term performance. The Marley NC Cooling Towers provided an energy-efficient, flexible and noise-reducing cooling solution for the growing facility, and the well-known durability and reliability of Marley products will help to ensure successful operation for years to come.

Products and Services Provided

Flowrate (m3/h): 1,390 m3/h
Hot Water Inlet Temperature (°C): 37.3
Range (°C): 8.3
Cold Water Outlet Temperature (°C): 29
Approach (°C): 8
Wet Bulb Temperature (°C): 21
Heat load (kw/h): 13,310 kW

Project Team

Marley Representatives: Cooling Towers & Accessories
Mechanical Contractor(s): JMMA
Project Managers: Jacobs Engineering

Assistenza reale da parte di un vero team

EMEA Cooling Tower Customer

I nostri clienti parlano: sentite cosa hanno da dire:

"Marley è stato il marchio da cui ho imparato tutto sulle torri di raffreddamento. Ancora oggi, utilizziamo Cooling Tower Fundamentals come guida di riferimento per i nuovi ingegneri che entrano in azienda".

"Con i prodotti SPX Marley, possiamo sempre confidare che le prestazioni di raffreddamento corrispondano ai dati per cui sono stati progettati e a quanto promesso!".
"Abbiamo mantenuto una torre di raffreddamento Marley da quando è stata installata nel 1984. È stata una grande attrezzatura!

it_ITItalian